The cultivation plan defines the target
Stage, day/night schedule, target ranges, and planned transitions describe the conditions required by the crop.
Equipment and climate
Gros.farm keeps the equipment list, climate targets, approved schedules, and actual history connected to the active crop cycle. The local control layer remains responsible for physical operation and safety.
English interface capture pending One operating model
That separation makes responsibilities clear. Crop technology defines what the production team wants to achieve; Gros.farm organizes and records the approved targets; the engineering layer operates the equipment.
Stage, day/night schedule, target ranges, and planned transitions describe the conditions required by the crop.
Approved values are connected to the facility, zone, crop cycle, stage, responsible people, and history.
PLCs, climate computers, and local nodes control ventilation, heating, circulation, dosing, and other connected equipment.
What the module supports
The useful result is not a longer device list. It is a traceable connection between a crop target, the approved configuration, the local system, and the actual conditions recorded afterward.
Use reviewed day and night values associated with the active cultivation-plan stage, or enter approved values manually.
Where supported, define a transition rate so a new target is introduced progressively instead of as an abrupt step.
Keep sensors, actuators, local nodes, and available capabilities connected to the facility or zone they actually serve.
Review temperature, humidity, CO₂, and other available data against approved target ranges and crop-stage context.
For supported systems, schedules can include operating windows, run periods, pauses, and other reviewed parameters.
Keep the target, approval context, transmitted configuration, and subsequent production history in one workflow.
From connection to routine use
A narrow first scope makes the engineering boundary easier to validate and gives the production team a result it can maintain.
Confirm which equipment, sensors, and local controllers belong to each physical production area.
Select the few climate parameters the team will review consistently, such as air temperature, humidity, or CO₂.
Check the protocol, available signals, units, update frequency, writable settings, and local safety constraints.
The agronomy and engineering owners confirm the target values, schedules, and responsibility boundary.
Use the resulting data to understand how the facility operated during a specific crop stage and period.
Product view
The current product screens below are temporarily shown in Russian. The workflow and data model are the same; English interface captures can replace them without changing the page structure.


Responsibility boundary
Cloud configuration and analytics must never be treated as a substitute for local engineering protection. Compatibility and writable control always require an assessment of the actual facility.
Plan a pilot
A useful first discussion is based on the real installation, not a generic equipment catalog.
Show which production areas are served by each controller and equipment group.
Provide model names, available interfaces, current programs, and any existing gateway or API.
Choose a result such as climate history by crop stage or approved target handoff for one zone.
Questions before implementation
No. The local system remains responsible for physical operation, regulation, interlocks, and safety. Gros.farm adds crop-stage targets, production context, data history, and supported configuration workflows.
Yes. A read-only first phase is often the safest and most useful way to validate units, signal quality, facility mapping, and the value of the resulting history.
No. Compatibility depends on the controller, protocol, wiring, data access, units, and facility configuration. The actual interface must be assessed before connection.
Local regulation and protective scenarios should continue according to the local system configuration. Cloud synchronization, remote changes, and some analytics may be temporarily unavailable.
Yes, where the workflow is configured and reviewed. A cultivation-plan stage can provide approved day and night targets, but responsible specialists remain accountable for the values and their application.
Start with the actual facility
Show us the production area, current system, responsible roles, and the result you want. We will help define a practical first phase.